上海GM交流

Ventilation Industry Solutions

——R&D, production and sales

National hotline:

thirteen billion eight hundred and ninety-seven million nine hundred and sixty-six thousand two hundred and twenty-one

 Shenyang Ventilation Engineering
Your current location: home page > news information
  •  Problems that should be paid attention to when installing air ducts in ventilation engineering construction
    Problems that should be paid attention to when installing air ducts in ventilation engineering construction Precautions for air ducts installed during the construction of ventilation works 1. The air ducts installed during the construction of ventilation works shall be smooth and clean, and outdoor air ducts shall be provided with rain and snow proof measures. 2. When the air duct extends into the structural air duct, the steel mesh shall be installed at its end to prevent sundries from entering the metal air duct during system operation. The gap between metal air duct and structural air duct shall be sealed tightly. 3. When the air duct passes through the settlement joint, the casing shall be added according to the design requirements, and the gap between the casing and the air duct shall be filled with filler

    View Details

  •  Installation method of construction air duct for fire and smoke exhaust works
    Installation method of construction air duct for fire and smoke exhaust works Installation method of construction air duct for fire and smoke exhaust works Air duct can be installed in place according to the site conditions, which can be connected to the length of a piece on the ground and installed in place by hoisting method, or the air duct can be placed on the support section by section and connected section by section. The general order is the main pipe first, then the branch pipe. The riser is generally installed from bottom to top. Leveling and alignment shall be carried out after installation in place to meet the requirements specified in the design. The problems that should be paid attention to in the installation of air ducts for ventilation engineering construction: when the air ducts are connected by non flange

    View Details

  •  Do you know how to arrange the ventilation duct construction?
    Do you know how to arrange the ventilation duct construction? Do you know how to arrange the ventilation duct construction? The air duct that discharges moist gas or contains water vapor shall have a slope of not less than 0.005, and drainage measures shall be taken at the low point of the air duct and the bottom of the fan. Corresponding anti-corrosion measures shall be taken for ventilation equipment, air ducts and accessories according to the environment and corrosiveness of the gas, steam or dust transported. Requirements for construction and installation of ventilation ducts: 1. Material requirements 1. All kinds of plates and pipes shall have quality certificates

    View Details

  •  What should be paid attention to in the construction of ventilation ducts
    What should be paid attention to in the construction of ventilation ducts What should we pay attention to in the construction of ventilation ducts? The construction of ventilation ducts is a kind of air exchange equipment. It uses mechanical or natural methods to send enough fresh air into the indoor space, and at the same time, it discharges the dirty air that does not meet the sanitary requirements, so that the indoor air can meet the sanitary requirements and production process needs. The construction of ventilation projects has a very wide range of use. Today, the facilities that complete ventilation work in buildings are collectively referred to as ventilation duct equipment. Duct Equipment Split Fan

    View Details

  •  Discussion on Construction Design, Fabrication and Installation of Ventilation Duct
    Discussion on Construction Design, Fabrication and Installation of Ventilation Duct Discussion on Construction Design, Manufacture and Installation of Ventilation Duct Ventilators are energy consuming equipment with large quantity and wide range. In order to save energy consumption of fans and reduce operating costs, attention should be paid to the optimization technology of ventilation and air conditioning system at present, so as to reduce the pressure drop and consumption of system ventilation duct construction, and reasonably match and optimize the operation regulation. The author found from the fan after-sales service site that the owner had identified the fan quality problem before, to the fan use site investigation, the results were quite part of the ventilation system design

    View Details

  •  Construction and installation of various air conditioning and ventilation pipes
    Construction and installation of various air conditioning and ventilation pipes For the construction and installation of various air conditioning and ventilation ducts, the thickness of galvanized steel plate shall be selected in the processing workshop according to the list of materials for the fabricated air duct. The galvanized steel plate shall be loaded into the leveling and reinforcing machine from the loading rack, and the end of the steel plate shall be cut off when the machine is started. When loading, check whether the steel plate is inclined, try to cut a steel plate, and measure whether the cut line of the sheared steel plate is vertical to the edge line, and whether the diagonal line is consistent. Input the cutting length and quantity in the material list into the computer, start the machine, and the computer will automatically cut and press the reinforcement. Sheet Cutting

    View Details

  •  Key points for calculation of construction and installation quota of ventilation pipeline engineering
    Key points for calculation of construction and installation quota of ventilation pipeline engineering Key points of quota calculation for construction and installation of ventilation duct works 1. Ventilation duct construction and components: power system: supply fan, return fan; Air handling system; Air delivery system: silencer, balance valve; Air distribution system: louver, exhaust outlet, air supply outlet Ventilation engineering construction: sheet steel, glass fiber reinforced plastic and composite. 2. Measurement principle: elbow, tee and reducer are not deducted; Special parts of the deduction valve: elbow guide vane, which does not deduct the quota of the use, manufacture and assembly during measurement; Cancel

    View Details

  •  Code for construction, fabrication, installation and acceptance of ventilation ducts and accessories
    Code for construction, fabrication, installation and acceptance of ventilation ducts and accessories Code for Construction, Fabrication, Installation and Acceptance of Ventilation Duct Accessories Now, the application of ventilation ducts is quite common, and the application environment is very wide. How should the ventilation ducts be arranged? The exhaust points of the dedusting system should not be too many to facilitate the resistance balance between the branches. The dedusting air duct should be laid as vertically or obliquely as possible. When laying obliquely, the included angle with the horizontal plane should be greater than 45 degrees. If it is necessary to lay horizontally or the inclination is less than 30 degrees, measures should be taken, such as increasing the flow rate. Duct of ventilation system

    View Details

  •  Detailed specification for installation of ventilation duct construction equipment
    Detailed specification for installation of ventilation duct construction equipment Specification and detailed rules for installation of ventilation duct construction equipment Today, various facilities in buildings that complete ventilation engineering construction work are collectively referred to as ventilation duct equipment. The ventilation duct equipment is divided into exhaust fan, ventilator, fan, etc., and also divided into industrial and household. The fan is divided into high, medium, low and negative pressure. Detailed specifications for the installation of ventilation duct equipment Ventilation engineering construction 1. The installation of the ventilator should meet the following requirements (1) During the trial run of the fan, the rotation direction of the impeller is correct, and after no less than 2h operation

    View Details

  •  Key points for quick installation of ventilation pipeline construction
    Key points for quick installation of ventilation pipeline construction In today's building facilities, we are not unfamiliar with the construction and application of ventilation ducts. We can often see the construction of natural gas, water pipes and cable ducts in the days. However, do you know about the quick installation of pipeline devices? Let's see what the key points are for the completion of ventilation pipeline construction: 1. Operators should strictly implement the special construction plan and the disclosure of safety technical measures. 2. During the horizontal transportation or hoisting operation of ventilation pipeline construction and subordinate equipment, the operators shall be mainly crane operators

    View Details

  •  Three reinforcement methods for ventilation pipe construction
    Three reinforcement methods for ventilation pipe construction The construction reinforcement of the ventilation duct can ensure the stability of the internal static pressure of the ventilation duct in practical use. If the pipe wall presents 1% deflection, the ventilation duct needs to be opened for reinforcement. In the process of reinforcing ventilation ducts, it is required to select corresponding reinforcement methods according to the pressure and size. The selection of reinforcement methods plays a decisive role in the service life of ventilation ducts. Generally, the following methods can be used to open the reinforcement. One, pull rod

    View Details

  •  What should be done for the connection of ventilation pipe construction
    What should be done for the connection of ventilation pipe construction During the construction of ventilation pipes, the pressure drop is relatively low. As we all know, some ventilation methods should be given priority as technical measures to ensure the air quality of the working and living environment and prevent indoor environmental pollution. Next, the spiral ventilation duct has a fine seaming forming process. The mold used for its imported equipment is also a special steel structure. Even if it has been used for three or five years, the appearance of its pressing mold will remain unchanged. When Shenyang ventilation pipe air

    View Details

  •  Construction method of air duct
    Construction method of air duct The air duct is an important part of the construction of the ventilation duct. The following is the construction method: 1) For more complex civil construction, in the design phase, all types of work (HVAC, water supply and drainage, power supply and lighting and construction disciplines) should first discuss the space separation and determine the elevation range of each type of pipe. Generally, you should not go beyond the limits of your own rules. In case of a single pipe section crossing the boundary, it shall negotiate with other projects. 2) The principle of dealing with the collision and coordination of various ventilation pipes, I

    View Details

  •  Key points for quick installation of ventilation pipeline construction
    Key points for quick installation of ventilation pipeline construction In today's building facilities, we are not unfamiliar with the use of pipeline engineering devices. We can often see the construction of natural gas, water pipes and cable pipelines in our daily life. However, do you know about the quick installation of pipeline devices? Let's see what the key points are: 1. Operators should strictly implement the disclosure of special construction plans and safety technical measures. 2. When the pipeline engineering devices and subordinate equipment are transported horizontally or hoisted, the operators shall be mainly crane operators

    View Details

  •  Preparation before construction of ventilation pipeline
    Preparation before construction of ventilation pipeline The function of ventilation ducts is to circulate air. They are mainly used in industrial and construction projects. They are widely used in industrial equipment, workshop purification systems, hotels, shopping malls, hospitals, factories and office buildings. But what preparatory work should we do in the construction of ventilation ducts? 1、 Construction preparation (I), operation condition 1, the equipment of general blower system and air conditioning system should be completed in the building enclosure, the obstacles have been cleared, and there is no

    View Details

  •  Installation of air duct and supports and hangers during ventilation duct construction
    Installation of air duct and supports and hangers during ventilation duct construction In the construction of ventilation ducts, besides air ducts, there are also some accessories such as supports and hangers. Therefore, its device is divided into two parts, one is air ducts, including spiral air ducts, rectangular frame air ducts, etc., and the other is supports and hangers. Let's introduce these two parts in detail. 1. Air duct (1) The iron sheet air duct shall be carried out during the construction of the bent structure of the building, and the device for expanding the air duct shall be removed after the construction. (2) Before installing the air duct, handle the air duct part

    View Details

  •  Common problems in ventilation pipe construction
    Common problems in ventilation pipe construction If the correct construction method is not paid attention to during the construction of ventilation pipes, the consequences will be more serious. Therefore, it is very important to discuss the correct operation process in the construction process. The following is a brief analysis of common problems in the installation of ventilation ducts. The above is all the contents of the common problems during the installation of the ventilation duct. Thank you for your patience. Friends who need help can come to our company for consultation. (1) For thick steel plate transporting flammable, combustible and explosive vapor

    View Details

  •  Preconditions for ventilation pipe construction
    Preconditions for ventilation pipe construction If we are careful, we can find that there are many rectangular pipes on the exterior walls of some factories. From the appearance, they are made of iron sheet. Do we know what the role of this pipe is? In fact, they are used for ventilation. Because the production operations in the factory often release some gases, some are harmless gases, but some are harmful gases, so in order to ensure the health of workers in the factory, these gases need to be discharged outside. To think about this

    View Details

  •  What are the key points of ventilation pipe construction?
    What are the key points of ventilation pipe construction? Ventilation ducts are metal or composite ducts used for natural ventilation and ventilation projects in industrial production and industrial buildings. They are indoor ventilation and can reduce the concentration of harmful substances in urban infrastructure. The key points of ventilation pipe construction are briefly introduced below. Before the construction of ventilation pipes, it is necessary to carefully check the goods to verify whether there are certificates and product specifications to establish the original constant pressure conditions, whether the product seals are intact and whether the appearance is invalid. When lead

    View Details

  •  It is easy to bury hidden dangers without paying attention to the six items of ventilation pipe construction
    It is easy to bury hidden dangers without paying attention to the six items of ventilation pipe construction The ventilation ducts are not new to everyone. They are our large indoor ventilation equipment. We can see them in some large public places, such as office buildings and shopping malls. Ventilation duct is a kind of hollow duct, mostly circular or square. The production and construction of ventilation ducts have a great impact on the later operation and the safety factor of operators. Therefore, it is necessary for operators to understand the precautions for ventilation duct construction. 1. The ventilation pipe has been constructed

    View Details

24-Hour Hour Hotline

thirteen billion eight hundred and ninety-seven million nine hundred and sixty-six thousand two hundred and twenty-one

Contact: Manager Li

Tel: 13897966221

Address: Shenyang Hunnan Xiangrui Industrial Park, No. 600, Nanling Village, Lixiang Street, Dongling District, Shenyang, Liaoning

WeChat QR code


Copyright @ Shenyang Hunnan Hongbaocheng Ventilation Equipment Factory Record No.: Service support: