Ventilation pipe construction Detailed specifications for equipment installation

Today, it is completed in architecture Ventilation engineering All facilities for construction work, collectively referred to as Ventilation duct Equipment. The ventilation duct equipment is divided into exhaust fan, ventilator, fan, etc., and also divided into industrial and household. The fan is divided into high, medium, low and negative pressure.

Detailed specification for installation of ventilation duct equipment

Ventilation engineering construction

1. The ventilator shall be installed in accordance with the following requirements

(1) During the test run of the fan, the rotation direction of the impeller is correct. After running for at least 2h, the temperature rise of the sliding bearing shall not exceed 35 degrees, and the high temperature shall not exceed 70 degrees; The temperature rise of rolling bearing shall not exceed 40 ℃, and the high temperature shall not exceed 80 ℃.

(2) The centrifugal fan is in close contact with the shock absorption pedestal, the bolts are tightened, and there is a locking device.

(3) When the fan of the ventilation duct construction pipeline is installed with the shock absorption hanger, the fan is closely connected with the shock absorption hanger, which is firm and reliable; When the support and trailer are used for installation, the fan is closely connected with the shock absorber, support and bracket, and is stable and reliable.

2. The installation of filters, paper dust collectors and filter absorbers shall meet the following requirements

(1) The model, specification and rated air volume of various equipment must meet the design requirements.

(2) The installation direction of various equipment must be correct.

(3) When the equipment is connected with the pipeline, the integrated rubber hose connector should be used, and no air leakage is allowed; The fixed support shall be flat and stable.

(4) The filter shall be installed firmly, and there shall be no obvious gap between the filter and the frame, or between the frame and the maintenance structure.

(5) The installation of paper dust remover and filter shall be firmly fixed, accurately positioned and tightly connected.

The article comes from the network, if you have any questions, please contact us!

 Ventilation duct


Recent browsing:

24-Hour Hour Hotline

thirteen billion eight hundred and ninety-seven million nine hundred and sixty-six thousand two hundred and twenty-one

Contact: Manager Li

Tel: 13897966221

Address: Shenyang Hunnan Xiangrui Industrial Park, No. 600, Nanling Village, Lixiang Street, Dongling District, Shenyang, Liaoning

WeChat QR code


Copyright @ Shenyang Hunnan Hongbaocheng Ventilation Equipment Factory Record No.: Service support: