上海GM交流

Ventilation Industry Solutions

——R&D, production and sales

National hotline:

thirteen billion eight hundred and ninety-seven million nine hundred and sixty-six thousand two hundred and twenty-one

 Shenyang Ventilation Engineering
  •  Two ventilation modes of ventilation pipe.
    Two ventilation modes of ventilation pipe. Shenyang ventilation duct is a necessary device for ventilation in buildings to keep indoor air fresh and indoor humidity. The following are two ventilation modes introduced by Jiangsu ventilation duct manufacturer. Let's see what features they have. Dilution ventilation. Dilution ventilation is also called mixed ventilation, that is, to send air with lower concentration than indoor pollutants to mix with indoor air, so as to reduce the concentration of indoor pollutants and meet the health standards. Displacement ventilation. In displacement ventilation system

    View Details

  •  Function of ventilation duct in kitchen
    Function of ventilation duct in kitchen Shenyang ventilation pipeline can provide a better working environment for chefs. Because there are many people eating in the hotel, the air quality in the hall is also very poor. With Shenyang ventilation pipeline equipment, it can provide a good dining environment for consumers and leave a good impression on consumers. The corrosion resistance of Shenyang ventilation pipeline is just better than before, but in the process of processing, the iron sheet has high requirements for temperature and humidity in the air supply and return system, and the ultra clean system has medium efficiency filtration, which is easy to fall off, oil

    View Details

  •  What details should be paid attention to when cooling the ventilation duct
    What details should be paid attention to when cooling the ventilation duct Shenyang ventilation duct manufacturers use ventilation ducts to cool down the main stream of the factory workshop, so what details should be paid attention to when using ventilation ducts to cool down? 1. Ventilate and cool down. Because the sun shines on buildings, machinery, equipment, human body and other heat sources, the temperature of places requiring ventilation is higher than that of outdoor places. The negative pressure fan can quickly discharge the hot air in the room, so that the room temperature and the outside temperature are equal, and the temperature in the workshop will not rise. 2. Air flow takes away human body heat, air flow

    View Details

  •  How to install the joint of Shenyang ventilation pipeline?
    How to install the joint of Shenyang ventilation pipeline? During the installation of Shenyang ventilation pipeline, its pressure drop is relatively low. As we all know, some ventilation methods should be given priority as technical measures to ensure the air quality of the working and living environment and prevent indoor environmental pollution. Next, the spiral ventilation pipe has a seaming forming process. The mold used for its imported equipment is also a special steel structure. Even if it has been used for three or five years, the surface of its pressing mold will remain unchanged. When Shenyang ventilation pipe

    View Details

  •  Brief Introduction of Shenyang Ventilation Pipe Processing Process
    Brief Introduction of Shenyang Ventilation Pipe Processing Process The process flow of Shenyang air duct processing mainly includes the following points: 1. Picking → distinguishing air duct sections according to the drawing → opening blanking → shearing → chamfering, etc. 2. The air duct of this project is connected by flange. 3. Before processing the ventilation pipe, check whether the selected data can meet the quality requirements, whether there is a factory certificate or quality documents, and the documents are requested to be submitted for inspection. 4. Angle steel flange manufacturing: the same drilling method shall be used for flanges of the same specification, so that the flanges have certain interchangeability

    View Details

  •  How to ensure the safety of ventilation pipeline transportation in Shenyang?
    How to ensure the safety of ventilation pipeline transportation in Shenyang? Shenyang ventilation pipeline shall be protected from damage during transportation. The connection of tenon air duct shall be coated with adhesive at the tenon to enhance the strength of the joint. When the air duct is installed overhead after ground pre assembly, the length of the pre assembly is limited to prevent the bending of the air duct due to its own weight from damaging the component interface. Good ventilation pipes shall be installed in strict accordance with the installation specifications of ventilation and air conditioning. Before construction, the construction unit shall first go to the site to get familiar with the actual situation of the site. Comparison Diagram

    View Details

  •  What will happen if the exhaust hood of Shenyang ventilation duct is not the right model?
    What will happen if the exhaust hood of Shenyang ventilation duct is not the right model? 1. The investigation results show that most of the users can choose the correct exhaust hood type, but there are also some wrong exhaust hood types. For example, a push table saw generates wood dust when sawing. Because of the large particle size and high specific gravity of wood dust, the wood dust generated during the push table sawing will fall to the ground after moving a short distance along the sawing streamline. In general, the lower suction hood should be used to control the wood dust generated by the push table saw, but the upper suction hood is used in the design

    View Details

  •  How to fully ventilate the ventilation pipeline in Shenyang?
    How to fully ventilate the ventilation pipeline in Shenyang? Shenyang Ventilation Duct How to Fully Ventilate The ventilation duct is used to transport dusty airflow. It connects the dust hood, dust collector, electric fan and other components together. Whether the pipeline planning is reasonable directly affects the usefulness of the entire dedusting system. Therefore, Shenyang ventilation pipe manufacturers believe that they should sum up and consider various problems in pipeline planning to obtain more reasonable and useful solutions. During operation, the interface between Shenyang ventilation pipe, electric fan and air outlet will oscillate

    View Details

  •  How to quote for Shenyang Ventilation Engineering?
    How to quote for Shenyang Ventilation Engineering? The quotation of Shenyang Ventilation Engineering, regardless of material, is based on the length of the center line of the air duct in the construction drawing. It is calculated according to the open area of the air duct with different section shapes (circle, square, rectangular), and measured in square meters. For the manufacturing and installation of purification ventilation pipes and components, the calculation method of quantities is the same as that of general ventilation pipes, and the corresponding quota is used. However, the purification cost of components and devices shall be calculated, and 35% of the base price of the devices of the corresponding component sub item shall be taken as the purification cost, of which the labor cost shall account for 40%. For purification pipeline

    View Details

  •  Cause of loud sound in ventilation duct and processing connection method
    Cause of loud sound in ventilation duct and processing connection method Shenyang ventilation ducts and natural ventilation are the digestive system of homes or buildings. Good protection and maintenance are crucial for good installation, comfort, moderation, high energy and efficiency. Select from many ventilation ducts, ventilation ducts and supplies, HVAC ventilation duct system software, etc. Shenyang ventilation duct vibration isolator is a flexible part that is usually inserted into the ventilation duct after or before the air handler to minimize the vibration generated during the operation of the ventilation duct system. Ventilation duct system

    View Details

  •  Explanation of kitchen smoke exhaust project
    Explanation of kitchen smoke exhaust project The manufacturer of Shenyang smoke exhaust project explains the kitchen smoke exhaust project for you: 1. The working principle of the oil fume purifier. The oil fume air passes through the specially made S-shaped baffle to balance the inertia collision and separation, remove the coarse oil fume particles, enter the high-voltage electrostatic field, and make a large number of oil mist particles passing through be adsorbed on the dust collection board, and then through the modular metal mesh and activated carbon filtration adsorption combination, Remove the remaining substances and odor, and discharge the purified clean air. 2、 Low altitude oil fume purifier is common on the market

    View Details

  •  How to clean the ventilation pipe
    How to clean the ventilation pipe With the passage of time, people's requirements for the cleanness of ventilation ducts and the saving of equipment data have gradually improved; With the progress of technology, people have made corresponding progress in the quality requirements of HVAC projects. The existing stainless steel air ducts and spiral round air ducts are widely used, satisfying the functional requirements of ventilation, air conditioning and dust removal transportation. The common air duct boards of ventilation ducts in the plant are aluminum foil composite phenolic foam board, aluminum foil composite polyurethane foam board, aluminum foil composite extruded polystyrene foam board, etc. This kind of wind

    View Details

  •  The Importance of Shenyang Ventilation Pipeline
    The Importance of Shenyang Ventilation Pipeline Let's understand the importance of Shenyang ventilation pipe! Preparation before construction: various device data shall be provided with factory certificate or quality judgment document and product list. The finished air duct shall be free from deformation, distortion, cracking, holes, flange falling off, missing riveting, missing bolt holes and other defects. The valve body, air outlet and other parts of the device shall be checked to see whether the conditioning device is flexible, and whether the noise elimination piece and paint layer are damaged. Data of device application: bolt, nut, washer and other auxiliary materials shall conform to the product

    View Details

  •  How to improve the processing quality of ventilation ducts
    How to improve the processing quality of ventilation ducts The quality of products is something we care about very much when we do anything. Only when the products are truly guaranteed in quality, can the smooth progress and completion of the whole thing be truly guaranteed. You know how to improve the quality of our products when we process ventilation ducts. This aspect is very critical for many people. Only if you can understand the ways and means, you can do the whole thing in the future

    View Details

  •  How to control the quality of ventilation ducts?
    How to control the quality of ventilation ducts? Because of its superior performance, low production cost, good use effect and other advantages, Shenyang ventilation pipeline has been applied in all walks of life, such as shipbuilding, tunnels, airports and other industries. From the macro point of view, the main applications of ventilation ducts can be divided into two categories: ventilation systems and air conditioning systems. Ventilation ducts play an important role in modern buildings, and their quality is also related to the quality of the project, so the construction workers of ventilation ducts

    View Details

  •  How to solve the damage of ventilation pipe
    How to solve the damage of ventilation pipe The popularity of ventilation equipment has promoted the development of ventilation equipment technology, making the installation technology of ventilation equipment better and better. However, it is inevitable that the Shenyang ventilation pipeline will be damaged during installation. Now, let's see how to solve this problem. If a special sealant can be used outside the pipeline to repair, and the aluminum foil layer on the external surface of the pipeline is damaged, but the glass fiber insulation layer is not damaged, a piece of qualified aluminum foil can be used to repair the aluminum foil surface of the pipeline

    View Details

  •  How to clean the impurities inside the ventilation pipe
    How to clean the impurities inside the ventilation pipe With the continuous growth of the use time of Shenyang ventilation pipeline, a lot of impurities will accumulate in it. These impurities will be stored in the pipeline for a long time, which will accelerate the oil condensation during operation. The temperature transition is too high, which will cause damage to the pneumatic valve, hydraulic pressure and other components, and have a great impact on the normal operation. Therefore, it is necessary to clean the ventilation pipeline equipment regularly. Today, I will introduce some cleaning methods: (1) When the air duct is connected with the fan, it should be softened at the air inlet and outlet

    View Details

  •  What should be done for anticorrosion and insulation of ventilation pipes?
    What should be done for anticorrosion and insulation of ventilation pipes? Shenyang Shenyang Ventilation Pipeline tells you what should be done for anti-corrosion and insulation of ventilation pipeline? 1. Select kitchen fume purifier, and give priority to the type of fume purifier. At present, there are mainly five kinds of smoke purifiers on the market: electrostatic oil smoke purifier, UV photolysis oil smoke purifier, composite low altitude emission purifier, wet (with water hood) oil smoke purifier, and water filtering oil smoke purifier. UV photodegradation machine has good purification effect, but the cost is relatively high, which is unacceptable to ordinary customers

    View Details

  •  What are the possible reasons for the blockage of the exhaust ventilation pipe
    What are the possible reasons for the blockage of the exhaust ventilation pipe With the development of economy and the improvement of people's living standards, it is convenient to eat out now. People with different tastes can find restaurants suitable for their own tastes. Now there are many catering companies. Each restaurant must have * kitchens that can cook and * kitchens to cook. However, due to the influence of exhaust ventilation pipes, their length and raw materials. A lot of noise may be generated during operation, which will affect the surrounding environment and will be affected by the surrounding environment. Resident complaints. So

    View Details

  •  Installation environment of Shenyang ventilation project
    Installation environment of Shenyang ventilation project The installation environment of Shenyang Ventilation Project has no direct natural ventilation, and the length of the inner walkway exceeds 20m, or the length of the inner walkway exceeds 60m although there is direct natural ventilation; Rooms without windows on the ground or with fixed windows with an area of more than 100m2 and frequent people staying or more combustibles; Atrium without natural smoke exhaust conditions or with a clearance height of more than 12m; The total area of each room is more than 200m, except for the rooms that use windows such as window wells for natural smoke exhaust

    View Details

24-Hour Hour Hotline

thirteen billion eight hundred and ninety-seven million nine hundred and sixty-six thousand two hundred and twenty-one

Contact: Manager Li

Tel: 13897966221

Address: Shenyang Hunnan Xiangrui Industrial Park, No. 600, Nanling Village, Lixiang Street, Dongling District, Shenyang, Liaoning

WeChat QR code


Copyright @ Shenyang Hunnan Hongbaocheng Ventilation Equipment Factory Record No.: Service support: