上海GM交流

Ventilation Industry Solutions

——R&D, production and sales

National hotline:

thirteen billion eight hundred and ninety-seven million nine hundred and sixty-six thousand two hundred and twenty-one

 Shenyang Ventilation Engineering
Your current location: home page > news information > Company News
  •  How to select and use appropriate ventilation control equipment in ventilation engineering?
    How to select and use appropriate ventilation control equipment in ventilation engineering? Shenyang ventilation project refers to the use of mechanical equipment, through different ventilation control equipment, to maintain the circulation and freshness of indoor air. This is very important for improving indoor air quality, eliminating odor and regulating indoor temperature and humidity. When selecting and using suitable ventilation control equipment, the following aspects should be considered. First, determine the appropriate ventilation control equipment according to the specific needs of ventilation engineering. Different places and needs may require different types of ventilation equipment. For example, Residential Pass

    View Details

  •  Routine maintenance method of ventilation pipe
    Routine maintenance method of ventilation pipe Shenyang ventilation pipeline is one of the standing facilities in gardens, industries, hospitals and other places. It plays the role of removing dirty air and entering fresh air to optimize the environment. As time goes by, the ventilation pipeline will be worn and aged due to various factors. Irregular maintenance will greatly increase the service life of the pipeline to ensure its smooth operation and normal use. Next, we will introduce the daily maintenance methods of ventilation ducts in detail. First, pay attention to the daily cleaning of the inside of the pipeline. If

    View Details

  •  Precautions in ventilation engineering construction
    Precautions in ventilation engineering construction A successful project requires attention from many aspects, and experience guidance is also indispensable. Today, I would like to share the necessary precautions for Shenyang ventilation project construction. 1. There are two methods for grooving tube sheets: manual grooving and mechanical grooving. There are three types of plate slotting: one plate slotting, two plate slotting, and four plate slotting. In terms of slotting, our company adopts mainly manual machinery as a supplement, and manual slotting has fine workmanship

    View Details

  •  What are the methods to improve the processing quality of ventilation ducts and the connection methods of ventilation ducts?
    What are the methods to improve the processing quality of ventilation ducts and the connection methods of ventilation ducts? Product quality is something we care about when we do anything. The whole work can be carried out smoothly only if the product quality is qualified, and the ventilation pipe is no exception. Do you know how to improve the processing quality of air ducts? First, in order to improve the processing quality of air ducts, good materials must be selected. Good materials can achieve good product quality, while bad materials cannot achieve good product quality, which is actually very critical for us. When processing, selecting good materials will help you achieve good quality

    View Details

  •  What is the difference between ventilation duct and smoke exhaust duct?
    What is the difference between ventilation duct and smoke exhaust duct? In many industrial workshops, we can often see various pipelines, among which Shenyang ventilation pipeline and smoke exhaust pipeline are common. Their shapes are similar, and some friends who don't know each other are still confused. What are the differences between ventilation ducts and smoke exhaust ducts? What are their characteristics? How to distinguish? I hope it can be helpful to answer these questions for you. 1、 How to distinguish between smoke exhaust pipe and ventilation pipe 1. The ventilation pipe with different functions is industrial and civil

    View Details

  •  Design principles of laboratory ventilation engineering
    Design principles of laboratory ventilation engineering Shenyang Ventilation Engineering tells you: the design principle of laboratory ventilation engineering The importance of laboratory ventilation engineering: laboratory ventilation engineering is one of the large-scale and influential systems in the whole process of laboratory design and construction. Whether the ventilation project is perfect or not will directly have an important impact on the laboratory environment, the health of laboratory personnel, the operation and maintenance of laboratory equipment, etc. Requirements of laboratory ventilation engineering: good ventilation effect, low noise, simple operation, energy saving

    View Details

  •  What role can ventilation ducts play in the kitchen?
    What role can ventilation ducts play in the kitchen? What role can ventilation ducts play in the kitchen? Shenyang ventilation pipeline can provide a better working environment for chefs. Because there are many people eating in restaurants, the air quality in the hall is also very poor. With Shenyang ventilation pipeline equipment, customers can be considered to provide a good dining environment and leave a good image for customers. The corrosion resistance of Shenyang ventilation pipeline has just been completed, but the iron sheet has higher requirements for temperature and humidity during processing

    View Details

  •  Installation of Silencer in Shenyang Ventilation Pipeline Project
    Installation of Silencer in Shenyang Ventilation Pipeline Project During the construction of Shenyang ventilation pipeline project, the muffler device should conform to the following rules (1) The muffler frame must be solid, the diaphragm size of the resonance chamber is close and correct, and the shell at the junction of the diaphragm and the wall plate is tight and leak free. (2) The direction of silencer device must be correct, and a separate support (hanger) shall be set. (3) The fixed end of the silencing plate must be firm after it is installed separately, and the distance between pieces must be uniform. (4) The anechoic sheet data shall be firmly bonded and flat, and the scattered data shall be evenly filled without obvious subsidence. (5) Silencing complex

    View Details

  •  The processing technology of ventilation pipe determines its excellent performance.
    The processing technology of ventilation pipe determines its excellent performance. The processing technology of ventilation pipe determines its excellent performance. China's economy has entered a period of rapid development, and people's requirements for quality of life have also made further progress. With the rapid development of the construction industry, there are more and more high-rise buildings, and the internal structure of the buildings is more and more complex, and the area is also more and more large. In this case, many buildings have used ventilation systems for useful air changes in the internal environment, Increase the freshness of the air and maintain the staff inside

    View Details

  •  What are the requirements for the materials of the construction system of fire control and smoke exhaust engineering?
    What are the requirements for the materials of the construction system of fire control and smoke exhaust engineering? What are the requirements for the materials of the construction system of fire control and smoke exhaust engineering? 1. The smoke exhaust pipe body, frame, fixing materials, sealing materials and flexible joints in the smoke exhaust pipe fire exhaust ventilation engineering system must be made of non combustible materials. When there are combustibles in the ceiling, the smoke exhaust pipe in the ceiling shall be insulated with non combustible materials, and shall be kept at least 150mm away from combustibles. Fire smoke exhaust engineering construction 2. Positive pressure air supply pipe Fire smoke exhaust ventilation engineering construction air supply pipe

    View Details

  •  Installation of smoke exhaust pipe and accessories in construction of fire smoke exhaust works
    Installation of smoke exhaust pipe and accessories in construction of fire smoke exhaust works Installation of smoke exhaust pipes and accessories in the construction of fire smoke exhaust works 1. The smoke exhaust pipes in the construction of ventilation works should be steel pipes or cast iron pipes. When welded steel pipes are used, their wall thickness shall be greater than 3mm; The pipe connection should be welded. When flange connection is adopted, the flange surface shall be flat and there shall be sealing groove; Heat resistant rubber gasket shall be padded between flanges. 2. Cast iron smoke exhaust pipe buried in concrete should be connected by flange. 3. The smoke exhaust pipe shall be equipped with thermal expansion compensator along the axis direction. One way sleeve

    View Details

  •  It is necessary for operators to understand the precautions of ventilation pipe construction
    It is necessary for operators to understand the precautions of ventilation pipe construction The ventilation ducts are not new to everyone. They are our large indoor ventilation equipment. We can see them in some large public places, such as office buildings and shopping malls. Ventilation duct is a kind of hollow duct, mostly circular or square. The production and construction of ventilation ducts have a great impact on the later operation and the safety factor of operators. Therefore, it is necessary for operators to understand the precautions for ventilation duct construction. 1. The ventilation pipe has been constructed

    View Details

  •  Ventilation ducts are metal or composite ducts used for natural ventilation and ventilation projects in industrial production and industrial buildings
    Ventilation ducts are metal or composite ducts used for natural ventilation and ventilation projects in industrial production and industrial buildings Ventilation ducts are metal or composite ducts used for natural ventilation and ventilation projects in industrial production and industrial buildings. They are indoor ventilation and can reduce the concentration of harmful substances in urban infrastructure. The key points of ventilation pipe construction are briefly introduced below. Before the construction of ventilation pipes, it is necessary to carefully check the goods to verify whether there are certificates and product specifications to establish the original constant pressure conditions, whether the product seals are intact and whether the appearance is invalid. When lead

    View Details

  •  Do we know the preconditions for the construction of ventilation ducts?
    Do we know the preconditions for the construction of ventilation ducts? If we are careful, we can find that there are many rectangular pipes on the exterior walls of some factories. From the appearance, they are made of iron sheet. Do we know what the role of this pipe is? In fact, they are used for ventilation. Because the production operations in the factory often release some gases, some are harmless gases, but some are harmful gases, so in order to ensure the health of workers in the factory, these gases need to be discharged outside. To think about this

    View Details

  •  Common problems in installation of ventilation ducts
    Common problems in installation of ventilation ducts If the correct construction method is not paid attention to during the construction of ventilation pipes, the consequences will be more serious. Therefore, it is very important to discuss the correct operation process in the construction process. The following is a brief analysis of common problems in the installation of ventilation ducts. The above is all the contents of the common problems during the installation of the ventilation duct. Thank you for your patience. Friends who need help can come to our company for consultation. (1) For thick steel plate transporting flammable, combustible and explosive vapor

    View Details

  •  Installation of smoke exhaust pipe and accessories in the construction of Shenyang smoke exhaust project
    Installation of smoke exhaust pipe and accessories in the construction of Shenyang smoke exhaust project Installation of smoke exhaust pipe and accessories in the construction of Shenyang smoke exhaust project 1. The smoke exhaust pipe in the construction of ventilation project should be steel pipe or cast iron pipe. When welded steel pipes are used, their wall thickness shall be greater than 3mm; The pipe connection should be welded. When flange connection is adopted, the flange surface shall be flat and there shall be sealing groove; Heat resistant rubber gasket shall be padded between flanges. 2. Cast iron smoke exhaust pipe buried in concrete should be connected by flange. 3. The smoke exhaust pipe shall be equipped with thermal expansion compensator along the axis direction. One way sleeve

    View Details

  •  Pipe layout of Shenyang smoke exhaust project
    Pipe layout of Shenyang smoke exhaust project The use of ventilation ducts in the pipeline layout of Shenyang Smoke Extraction Project can make good ventilation, promote indoor air circulation, control the speed of air flow to alleviate the sense of suffocation. What is ventilation? It means that the dirty air in the indoor or enclosed space is discharged, and the harmful substances produced in the factory are all discharged outside after purification treatment, Then fresh air is sent into the room to dilute harmful substances in the air to meet people's demand for air. Fire fighting and smoke exhaust engineering

    View Details

  •  Pipe Fittings in Shenyang Ventilation Engineering Construction
    Pipe Fittings in Shenyang Ventilation Engineering Construction The cleaning hole of pipe fitting 1 in the construction of Shenyang Ventilation Engineering is generally located on the side of inclined and horizontal pipes, near or at the end of special-shaped pipes, tees and elbows. The cleaning hole shall be made tightly without air leakage. 2. It is inevitable that the resistance of the centralized dedusting system with regulating valve is unbalanced during operation. Therefore, regulating valve is set on the vertical pipe section connected with the dust hood. The common regulating valves are butterfly valves, inclined gate valves, etc. It is generally not allowed to use

    View Details

  •  Silencer installation in Shenyang ventilation engineering construction shall meet the following requirements
    Silencer installation in Shenyang ventilation engineering construction shall meet the following requirements During the construction of Shenyang Ventilation Project, the installation of muffler shall comply with the following requirements. (1) The muffler frame must be firm, the diaphragm size of the resonance chamber is close and correct, and the shell at the junction of the diaphragm and the wall plate is tight without leakage. (2) The muffler must be installed in the correct direction, and a separate support (hanger) shall be set. (3) The fixed end of the silencing piece must be firm after it is installed separately, and the distance between pieces must be uniform. (4) The anechoic sheet material is firmly and smoothly bonded, and the bulk material is evenly filled without obvious subsidence. (5) Silencing compound material

    View Details

  •  Problems that should be paid attention to when installing air ducts in ventilation engineering construction
    Problems that should be paid attention to when installing air ducts in ventilation engineering construction Precautions for air ducts installed during the construction of ventilation works 1. The air ducts installed during the construction of ventilation works shall be smooth and clean, and outdoor air ducts shall be provided with rain and snow proof measures. 2. When the air duct extends into the structural air duct, the steel mesh shall be installed at its end to prevent sundries from entering the metal air duct during system operation. The gap between metal air duct and structural air duct shall be sealed tightly. 3. When the air duct passes through the settlement joint, the casing shall be added according to the design requirements, and the gap between the casing and the air duct shall be filled with filler

    View Details

24-Hour Hour Hotline

thirteen billion eight hundred and ninety-seven million nine hundred and sixty-six thousand two hundred and twenty-one

Contact: Manager Li

Tel: 13897966221

Address: Shenyang Hunnan Xiangrui Industrial Park, No. 600, Nanling Village, Lixiang Street, Dongling District, Shenyang, Liaoning

WeChat QR code


Copyright @ Shenyang Hunnan Hongbaocheng Ventilation Equipment Factory Record No.: Service support: